Demography

Navi Mumbai is close to Mumbai. The Maharashtra Government industrial promotion policy leads to development of industrial belt in Navi Mumbai. These industries, in turn, attracted a large population as workers.

Also, the cost of real estate and housing in Navi Mumbai is much less than costs in Mumbai and sub-urban areas. Owing to this, many government and corporate offices have shifted from Mumbai to Navi Mumbai. Industrial belt of Taloja-Thane-Belapur in Navi Mumbai offers job opportunities of every conceivable kind - from engineers to mechanics to clerks to peons, in multiple industries like Chemical, Pharmaceutical, Electronics, Engineering, Textile Processing, Oil Processing, Paper, Plastic, Steel and Food. As a result a large population of service class and middle class population now resides at Navi Mumbai.

The population residing within NMMC area has increased from 3.18 lakhs in 1991 to 7.04 lakhs in 2001. The decadal growth rate in various zones of NMMC varied from 8 % in Airoli to 309 % in Digha (table below). The overall increase in population during 1991-2001 was 82 percent.

Zone Name 1991 2001 Decadal Increase %
A Belapur 38,343 73,069 91
B Nerul 52,767 1,16,842 121
C Vashi 74,564 1,11,600 50
D Turbhe 40,700 1,02,569 152
E Koparkhairane 49,863 1,04,296 109
F Ghansoli 23,691 51,632 118
G Airoli 83,756 76,889 - 8
H Digha 13,295 54,326 309
I Dahisar 10,227 12,724 24
Total: 3,87,206 7,03,947 82

तलाव

 

To improve the visual aesthetics of the public infrastructure like development of gardens, rejuvenation of lakes, holding ponds, traffic islands lakes Restoration & Conservation. Twenty two Lakes have since been covered under the same.

  • Activities : Task completed
  • Dewatering, Desilting of all lakes.
  • Constructed Gabion retaining wall along periphery & partition wall for Idol Immersion tank
  • Beautification of lake surroundings using ultra-modern infrastructure i.e. Tensile Structures, Signage, Jodhpur Red stone entry Gates, benches etc.
  • Decorative lights, flowerpots, cobal stone path way, stamp concrete for Ghat.
  • Restricted entry of pollutants by providing RCC Nirmalyakund, washing area & Idol Immersion partition of the lake.
  • Improved & Maintained water quality of lake bodies by providing Controlled Aeration system and Central Fountain to the Lakes.

धारण तलाव (होल्डींग पाँड)

 

Navi Mumbai is perhaps only city inIndia where storm water disposal system and waste water disposal system are made separate

The City is a part of North Konkan region and is situated between Parsik Hill mountain range which has an elevation of 45.00 MRL in the east and Thane creek on the West where the average Ground level is 2.00 MRL. The entire nodes or townships developed by CIDCO and the old village or Gaothans are built on reclaimed land. The high tide level with respect to mean sea level in Konkan region is 4.5 meters. To avoid cost of reclamation, the formation level of city is kept below high tide level. This area receives very high rainfall of 3000mm approximately causing water logging due to high tide and land slide due to fast reseeding of mountain water.

The city is below high tide level due to which low lying areas are faced with its related problems. As a solution, department storm water management of Navi Mumbai has been planned on the lines of the Netherlands and is called the "Dutch Method". In Netherlands, mechanical gates are used which are operated by electric power in NMMC, automatic mechanical gate has been proposed. Its operation is based on water pressure during High-Tide and Low- Tide and does not require electrical power, making it Eco-friendly Operation Maintenance of System.

For efficient running of storm water disposal system, NMMC gives operation and maintenance contract for pump houses and functioning of flap gates during monsoon period.

Air Quality Monitoring Network

 

Presently there are 4 active CAAQMS (Continuos Ambient Air Monitoring Stations) in addition to an air monitoring mobile van.

The decreasing trend in NOx and PM2.5 levels in NMMC could be attributed to the successful completion of concretization of 19 junctions within the city as well as the work of Sion- Panvel highway. Also adding to this is the regular cleaning by vacuum suction machines and plantations along the road side.